Quick answer
After Master, spot-check the output, then decide whether to delete/archive the original; keep a backup. Master depends on area/double vanity/shower/tub.
Why it matters
A backup lets you roll back if the output is wrong.
Area.
Step by step
- Check area/layout/plumbing/waterproofing/materials.
- Separate demo/plumbing/waterproofing/tile/fixtures/labor.
- Get 2-3 quotes; confirm scope/materials/timeline.
- Contract states scope/changes/payment/warranty.
Common mistakes
- Total price only, not plumbing/waterproofing.
- Ignoring layout/demo/permits.
- Not checking materials/fixtures/warranty.
- No change/timeline terms.
Checklist
- Area/layout/plumbing/waterproofing/materials.
- Demo/plumbing/waterproofing/tile/fixtures.
- Permits/ventilation/waterproofing/timeline.
- Contract/changes/payment/warranty.
- Budget/ROI/maintenance.
Who it is for
If this is your first Master, narrow by Area. and Vanity. first, then look at specific models.
Key facts
- Area.
- Vanity.
- Tub.
FAQ
What should I do after Master?
After Master, spot-check the output, then decide whether to delete/archive the original; keep a backup. Master depends on area/double vanity/shower/tub.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: HomeAdvisor